Hello, welcome to visit the official website of WUXI XINXIA MACHINERY FACTORY!

News

Your location:> Home > News > Industry trends

Preparation of double numerical control steel bar straightening hydraulic cutting machine before starting up

Publisher:admin Number of:0

Preparation before startup

1. Operators must wear safety helmet and protective gloves, otherwise they are not allowed to enter the site.

2. Make sure that there are no other non operators around the machine, in case of accidents and irreparable consequences. 3. In order to make the equipment have good working condition, grease should be added to each lubricating point before starting up.

4. Check whether the lubricating oil in each box and reducer is sufficient. Make the lubricating oil in the middle of the oil level above the oil mark. If the oil level is too low, replenish the lubricating oil in time.

5 check whether there is screw looseness in each part.

6 check whether the air source and power supply are connected, and connect the PE line to the grounding point.

7. Check whether the electrical circuit switch and detection switch are normal, and check whether the air pipe is in good condition.